Statement in Response to Daily Record Enquiry on QEUH
The construction of the building was carried out between 2009 and 2015. Any issues during this time were the responsibility of Brookfield, the contractor. As…
The construction of the building was carried out between 2009 and 2015. Any issues during this time were the responsibility of Brookfield, the contractor. As…
You may already be aware that we are investigating two isolated cases of a rare fungal infection – Cryptococcus – at the Queen Elizabeth University…
An Incident Management Team (IMT) has been set up to investigate three cases of Staphylococcus aureus blood stream infection in extremely premature babies in the…
The investigation remains ongoing into the cause of two isolated cases of Cryptococcus at the Queen Elizabeth University Hospital. At present, the clinical, management and…
The investigation remains ongoing into the cause of two isolated cases of Cryptococcus at the Queen Elizabeth University Hospital. These two cases of infection were…
Investigations are continuing into two isolated cases of an unusual fungal infection within the Queen Elizabeth University Hospital. The organism is a Cryptococcus species, which…
Our engineering experts have now completed work to resolve the water and drainage issues in the two paediatric cancer wards at the Royal Hospital for…
Traces of bacteria have been found during testing in the drains of two wards in the Royal Hospital for Children. We are carrying out chemical…
Replacement products for cladding panels on sections of the Queen Elizabeth University Hospital and on a section of the Royal Hospital for Children have now…
The Queen Elizabeth University Hospital is one of the most fire safe buildings in the country having been designed and engineered to meet building and…